850-477-8181 Webb Electric Company of Florida, Inc.

Repair Electrical System Distribution McGuire Air Force Base, New Jersey

Project Cost: $4,969,541.00
Completion: October 2005
Contract Method: Firm Fixed Price/RFP

Brief Description of Project:

This project included replacing the existing outdoor open bus structure substation with new 35kv walk-in protected aisle switchgear and a new 34.5kv to 12.47kv double-ended substation. This included replacing the existing overhead electrical distribution system with a new 15kv underground system. A new 15kv manhole and duct bank system with high voltage switches, sectionalizing cabinets, and transformers was provided. New decorative street lights and controllers were provided along several streets on the base.

Recent Projects

Webb Electric Company of Florida, Inc.
3194 W. Nine Mile Road • Pensacola, FL 32534
850-477-8181 • 850-477-8922 (FAX)